At any time glazing and cladding can fail for a variety of reasons, a high percentage of failures involve windows, glazing, curtain walling, cladding and atria. Failures generally occur through design defects, severe weather or quality consistency issues in terms of the original installation operation. Utilising our trained commercial building access specialists, we will undertake a photographic forensic analysis and testing of the installed components and associated glazing or cladding systems.
Upon completion of our intrusive investigation works and rigorous testing regime, the client will be provided with an in-depth written report: to include a detailed photographic report which will grade the severity of defects identified, detailed GA drawings to include section through detailing as required and of course a fully costed comprehensive quotation highlighting all required remedial works.
Here at GS UK we understand that every project is different, therefore our failure investigation programs are tailored to suit the individual commercial project to arrange your Failure Investigation, please contact us today.